SHA-Downtown Redding CAPM
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
12/01/2026
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans), using State and Federal funding, is proposing a Capital Preventive Maintenance project that would cold-plane existing asphalt concrete pavement and overlay from edge of pavement to edge of pavement on State Route 273 from PM 14.5/18.5 and PM 18.7/20.033, State Route 44 from PM L0.0R/L0.444R and PM L0.0L/L0.395L, State Route 299 from PM 23.89/G24.088, build new complete streets assets including crosswalks, enhanced crosswalks, sidewalk, class 1 bike lane, and two class 2 bike lane locations. The project would restore the pavement, culvert, and TMS elements to a good condition. The project would also improve accessibility and ease of travel for bicyclists and pedestrians.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|