Seawolf Parkway at Pelican Island
PROJECT WEBSITE: https://www.txdot.gov/projects/projects-studies/houston/seawolf-parkway-at-peli…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/31/2028
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
The proposed project would replace the existing Pelican Island Causeway (Seawolf Parkway) lift bridge with a fixed span bridge structure and reroute a portion of Seawolf Parkway around the north side of the Texas A&M Galveston Campus. The proposed bridge would also include bicycle and pedestrian accommodations. The proposed bridge would be on new location and would meet Gulf Intracoastal Waterway (GIWW) clearance requirements. The proposed project would provide a safe and reliable crossing of the Pelican Island Channel for both vehicular and pedestrian traffic, and to ensure uninterrupted access for evacuation and for emergency and basic services to Pelican Island. The proposed project would require approximately 28.5 acres of right of way and 0.2 acre of drainage easement.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|