Seawolf Parkway at Pelican Island

PROJECT WEBSITE: https://www.txdot.gov/projects/projects-studies/houston/seawolf-parkway-at-peli…

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/31/2028

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Texas

LEAD AGENCY
Texas

Description:

The proposed project would replace the existing Pelican Island Causeway (Seawolf Parkway) lift bridge with a fixed span bridge structure and reroute a portion of Seawolf Parkway around the north side of the Texas A&M Galveston Campus. The proposed bridge would also include bicycle and pedestrian accommodations. The proposed bridge would be on new location and would meet Gulf Intracoastal Waterway (GIWW) clearance requirements. The proposed project would provide a safe and reliable crossing of the Pelican Island Channel for both vehicular and pedestrian traffic, and to ensure uninterrupted access for evacuation and for emergency and basic services to Pelican Island. The proposed project would require approximately 28.5 acres of right of way and 0.2 acre of drainage easement.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete