SBD-18 CAPM

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
07/03/2026

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

This project is located along State Route 18 (SR-18) in San Bernardino County (SBd), from 0.1 mile east of the Route 138/18 Separation at Post Mile (PM) R17.8, to View Drive at PM 31.7. The project scope includes the following: 1) 0.2' mill and overlay pavement. 2) Localized digouts where needed. 3) Replace 14 drainage culverts (PM 19.80, 20.09, 21.14, 22.93, 25.72, 25.74, 26.88, 28.76, 29.45, 30.40, 30.55, 30.64, 30.74, 31.34). 4) Repair slope at 3 locations (PM 18.50, 25.50, 26.49). 5) Replace existing pavement by excavation at 2 locations (PM 18.50, 26.49). 6) Upgrade existing metal beam guardrail to Midwest Guardrail System (MGS). (Locations of replacement are indicated on the layouts). 7) Upgrade Transportation Management Systems (TMS) including two Extinguishable Message Signs (EMS) (PM 20.52, 20.67). 8) Implement Class III bike route from PM 22.958 to PM 31.65 including signage, pavement markings, and bicycle friendly grates. The Class III bike route will not require additional right of way or road expansion.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete