Route 22/322 Clark's Ferry Improvement Project
PROJECT WEBSITE: https://www.penndot.pa.gov/RegionalOffices/district-8/PublicMeetings/DauphinCou…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
The SR 0022, Section 075 (Riverlands Safety Study Implementation) project proposes to replace the existing center turn lane with a continuous median barrier from the Clarks Ferry bridge to the recently extended median barrier at the newly constructed Rutter’s convenience store near the US 11/15 interchange. Improvements would also include robust signing, pavement marking and lighting for a westbound frontage lane that would serve local traffic right turning movements and improvements to the US 11/15 interchange that would improve Ramp B (US 11/15 Southbound to US 22/322 Eastbound) and Ramp D (US 11/15 Northbound to US 22/322 Eastbound) to meet current design criteria for acceleration lane lengths. Improvements are also planned at the US 22/322/PA 147 interchange including the construction of a dedicated northbound PA 147 left turn lane to facilitate left turns from PA 147 to the US 22/322 Westbound on-ramp.
The SR 0022, Section 059 (Clarks Ferry Bridge Rehabilitation) project consists of a bridge preservation on US 22/322 over the Susquehanna River in Reed Township, Dauphin County. The project includes six separate structures, consisting of both a prestressed and steel superstructure section for EB and WB traffic and two steel superstructure ramp bridges.
The preservation activities would include deck rehabilitation and overlay, replacing the existing armored compression seals, repairing prestressed beam ends and spalled diaphragms, pier cap rehabilitation, clear and repaint bearing under joints, and replacing tooth expansion dam and down spouting.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|