RIV-74-COMBINED EA (1M520 & 1C073)-Rehab

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
07/15/2026

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

The purpose of this project is to preserve and extend pavement surface life, restore and extend culvert life, upgrade guardrail and signs to current standards, address storm water needs to ensure compliance, and mitigate for drainage on State Route (SR) 74 from Postmile (PM) 78.1/R92.3. The segment within the project limits of SR-74 consists of pavement currently classified as fair condition. If left in the existing condition, the pavement will deteriorate further and distress. In addition, 17 culverts are currently classified as being in poor condition. If left uncorrected, culverts will deteriorate further and will require major rehabilitation. Furthermore, some guardrail and signs need upgrading to enhance motorist performance. Lastly, these locations include the need of storm water mitigation; if left untreated, best management practices may result in noncompliance. The need for drainage mitigation has been identified, if left uncorrected, the side slopes will erode and deteriorate further.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete