Red Rock Safety
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/24/2028
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
This section of US 395 was identified in the statewide crossover collision monitoring program for higher-than-average fatal collision rates for the period between January 1, 2017 and December 31, 2021. Of the 33 total crossover and run-off-road collisions identified within this segment, eight resulted in fatalities, seven involved injuries, and 18 were property damage only. The fatal collision rate was 2.2 times greater than the statewide average for similar facilities.
Caltrans proposes pavement widening, and other safety improvements, to 11.5 miles of United States Route 395 (US 395) in Lassen County. The programmable project alternative, Alternative A, will: • Provide a 12-foot paved median with concrete barrier and 8-foot paved shoulders throughout the project limits • Improve the CRZ throughout the project limits • Extend 46 culverts • Widen two bridges: 07-0023 Long Valley Creek and 07-0068 Galeppi UC • Install 950 LF of new guardrail • Construct 10 truck turnouts
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|