PULGA PROFILE CHANGE PROJECT
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/06/2022
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) proposes a permanent restoration of roadway on State Route (SR) 70 in Butte County between post mile (PM) 46.0 and 47.0 by raising the existing roadway profile approximately 5 feet, replacing the Bear Creek Bridge (No. 12-0039) at PM 46.40, protecting the embankment with Rock Slope Protection (RSP), and installing a retaining wall to safeguard against future flood damage.
The proposed project occurs on the east bank North Fork Feather River (East Branch) within the Feather River Canyon in eastern Butte County, approximately 4.3 miles northeast of the town of Pulga and 25 miles northeast of Oroville
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|