Proposed Liloa Drive Extension (Vicinity of East Waipuilani Road to Vicinity of Kaonoulu Street)
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
09/30/2025
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
The County of Maui, Department of Public Works proposes a 4,900-foot extension of Liloa Drive from the vicinity of East Waipu‘ilani Road to the vicinity of Ka‘ono‘ulu Street. The proposed roadway improvements will include curb, gutter, sidewalk, curb ramps, bridge crossings at existing drainageways, a shared use path for both pedestrians and bicyclists, signage and striping, utility adjustments and relocations, and landscaping. While the project will primarily occur within the existing road right-of-way (ROW) that has long been planned for the Liloa Drive Extension project, construction will require temporary rights-of-entry (ROE) or temporary construction easements from some landowners immediately abutting the corridor to facilitate construction of the project. In addition, a limited number of permanent easements and acquisitions will be required.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|