Port of Adak Pier Five Improvements Project

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
05/28/2026

5 out of 5

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Ports and Waterways

SECTOR
Ports and Waterways

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Maritime Administration

Other Agencies with Actions or Authorizations:

Department of the Interior

Department of the Interior, Fish and Wildlife Service

Department of Commerce

Department of Commerce, National Oceanic and Atmospheric Administration

Department of the Army

Department of the Army, US Army Corps of Engineers - Regulatory

Description:

The Aleut Corporation (TAC) is proposing improvements to Pier Five at the Port of Adak in the Aleutian Islands of Alaska. The Proposed Action entails repairs and updates to Pier Five, the primary supply pier for this remote Alaskan village. The grant would fund planning and permitting work, removal of the deteriorated timber pile fender system, installation of a high-energy absorbing fender system, and installation of new sewer, firefighting water, and potable water.

The Proposed Action includes planning, environmental documentation, engineering, permitting, and procurement. Construction includes construction management, removal of the deteriorated timber pile fender system, repairs to damaged concrete piles and caps, installation of a high-energy absorbing fender system, and installation of new sewer, firefighting water, potable water, electrical and communications utilities, and LED lighting.

Component 1 – Final Design and Engineering

  • Planning, final design, environmental review, inspection, permitting, and project bidding and award.  Dive inspection of piling.

Component 2 – Pier Five Improvements

  • Removal/Demolition of the existing timber pile fender system, timber wale top rail, steel egress ladders, under-deck catwalk system.
  • Repair/Replacement of damaged prestressed concrete piles on the southwest end, outboard, section of Pier Five and of concrete pile caps.
  • Installation of a modern high energy absorbing fender system, with rubber cylindrical fenders, designed around the mooring requirements of the 58-foot commercial fishing vessel fleet.
  • Inset egress ladders will be incorporated into the face of the fender assemblies.
  • Install anodes on support piles below water.
  • Installation of a new sewer, including upland replacement, potable water, and firewater on Pier Five.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete