North Station Draw One Bridge Replacement Project EA
PROJECT WEBSITE: https://www.mbta.com/projects/north-station-draw-one-bridge-replacement
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/29/2026
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Transit Administration
Other Agencies with Actions or Authorizations:
Department of the Army, US Army Corps of Engineers - Civil Works
Department of Commerce, National Oceanic and Atmospheric Administration
Department of Homeland Security, US Coast Guard
Description:
The Massachusetts Bay Transportation Authority (MBTA) proposes to replace and modernize the existing North Station Draw One Bridge over the Charles River at North Station in Boston and Cambridge, MA. The project proposes to replace the current four-track, two-span movable draw bridge with a six-track, three-span draw bridge to improve commuter rail transit service. The project includes improvements to bridge substructures, track alignments, signaling and communications systems, and passenger platforms at North Station to improve performance, safety, and reliability. The project also proposes to remove and replace the original Draw One Bridge Control Tower A.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|