Merced Seismic Restoration
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
11/07/2022
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) proposes to seismically retrofit seven bridges in Merced County to increase their structural integrity in case of a seismic event and upgrade deficient bridge railings to current standards.
The project would seismically retrofit seven bridges on State Routes 59, 140, and 152in Merced County to increase their structural integrity by doing the following:
- Adding steel column casings
- Retrofitting hinges with pipe seat extenders and cable restrainers
The work would bring the bridges up to current standards and minimize the risk of collapse during a seismic event. The project would also upgrade the non-standard bridge railings. In addition, 8-foot shoulders would be added on the Los Banos Creek/West Branch Mud Slough bridge (Bridge Number 039-0090); the bridge currently has no shoulders and does not match the approaching oadway, which has 8-foot shoulders.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|