Lowell Hill Curves Realign roadway, improve curves, and widen shoulder widths
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/06/2021
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) proposes to improve two non-contiguous segments of the alignment of State Route (SR) 20 in Nevada County between post miles (PM) 29.7-30.9 and 36.8-39.8 by modifying the existing horizontal and vertical curves of the roadway and adding turnouts. This project will update the roadway to current standards by increasing the curve radii, widening shoulders to 8 feet, adding turnouts for both directions, and improving the vertical profile grade. Additionally, this project will improve the clear recovery zone (CRZ) by removing obstacles and flattening slopes close to the traveled way. Two main project segments occur between PM 29.7-30.9 and 36.8-39.8 are referred to as White Cloud and Lowell Hill segments respectively.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|