IH 610 Elevated Car Lanes
PROJECT WEBSITE: Open House - I-610 Elevated Express Lanes
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
PAUSED
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
SUBJECT TO CHANGE
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
TxDOT proposes to construct four elevated express lanes (two in each direction) primarily in the center of IH 610 West Loop mainlanes from IH 10 West to IH 69 (US 59) South, a distance of approximately 3.7 miles in Houston, Harris County, Texas. The express lanes would not be tolled. Although the project’s logical termini limits are from IH 10 to IH 69 (US 59), the actual construction limits would extend beyond each limit in order to transition back into the existing highway configuration. The transition would extend to approximately 140 feet south of IH 69 (US 59) and approximately 505 feet north of IH 10.TxDOT proposes to construct four elevated express lanes (two in each direction) primarily in the center of IH 610 West Loop mainlanes from IH 10 West to IH 69 (US 59) South, a distance of approximately 3.7 miles in Houston, Harris County, Texas. The express lanes would not be tolled. Although the project’s logical termini limits are from IH 10 to IH 69 (US 59), the actual construction limits would extend beyond each limit in order to transition back into the existing highway configuration. The transition would extend to approximately 140 feet south of IH 69 (US 59) and approximately 505 feet north of IH 10.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|