IH 10 @ San Jacinto River

PROJECT WEBSITE: https://www.txdot.gov/projects/projects-studies/houston/i10-at-san-jacinto-rive…

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
07/31/2028

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Texas

LEAD AGENCY
Texas

Description:

The proposed project would replace the existing bridges over San Jacinto River and modify the bridge approaches to limit potential waterborne strikes of the bridge substructures, thus improving safety, access, and navigation for the mariner community and general safety for the traveling public. The proposed project would also add capacity to the existing I-10 project limits by adding one general purpose lane and two high-occupancy vehicle (HOV) managed lanes in each direction. Proposed improvements along Spur 330 include widening to add one HOV managed lane in each direction and direct access to the I-10 managed lanes. The replacement I-10 bridge, while currently still in design, would tentatively consist of a steel girder bridge with a 52-foot vertical clearance and a 386-foot horizontal clearance. The total project length is 3.75 miles and approximately 3.6 acres of new right-of-way would be required for the proposed improvements.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete