I-580 Bridge Rehabilitation Project
PROJECT WEBSITE: https://d4vpm3.wixsite.com/i-580-bridge-rehab
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
12/15/2022
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) proposes to upgrade existing non-standard bridge barrier railings to current on the following three bridges located along Interstate 580 (I-580) in the City of Oakland in Alameda County: the Fruitvale Avenue Undercrossing [UC] (Bridge Number 33-0324) at postmile (PM) R41.43, the Broadway-Richmond Boulevard UC (Bridge Number 33- 0285) at PM 44.51, and the Webster Street UC (Bridge Number 33-0296) at PM 44.81. Caltrans also proposes to seismically retrofit the Fruitvale Avenue UC and the Broadway-Richmond Boulevard UC. Additionally, Caltrans proposes to demolish two pedestrian overcrossings (POC) spanning I-580 and either construct a new replacement POC over I-580 connecting Crescent Street to MacArthur Boulevard or instead enhance the nearby Grand Avenue, MacArthur Boulevard, and Santa Clara Avenue between the touchdowns of the existing POCs. The POCs proposed to be demolished are: the Santa Clara Avenue POC (Bridge Number 33-0312) at PM 43.76 and the Van Buren Avenue POC (Bridge Number 33-0313) at PM 43.75.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|