I-526 Lowcountry Corridor West Improvements
PROJECT WEBSITE: https://www.526lowcountrycorridor.com/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/21/2023
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
The 23-mile connection between West Ashley and Mount Pleasant, known as the I-526 Lowcountry Corridor (LCC), has been identified by SCDOT as one of the state’s most congested interstate highways — and it’s among the Department’s top priorities statewide. As such, SCDOT and FHWA are currently evaluating current and future transportation demands in the existing I-526 LCC, from south of Paul Cantrell Boulevard in West Ashley to south of U.S. 17 in Mount Pleasant. Current challenges along the corridor have been identified as the growing demand for capacity resulting in increasing congestion. That could mean more lanes, new technology, or other strategies aimed at accomplishing these goals.
This corridor has been broken down into two distinct projects – I-526 Lowcountry Corridor WEST and I-526 Lowcountry Corridor EAST. An Environmental Impact Statement (EIS) is being prepared for the I-526 LCC WEST project, which runs from Paul Cantrell Boulevard in West Ashley to Virginia Avenue in North Charleston. The purpose of the project is to increase capacity and improve operations at the I-26/I-526 interchange and along the I-526 mainline in this study area.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|