I-270 Corridor Improvements – EIS
PROJECT WEBSITE: http://www.codot.gov/projects/studies/i270study
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
10/23/2026
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
Safety, Operational and Capacity Improvements to I-270: Improving the I-270 corridor is a priority for CDOT, FHWA, and local agencies. The I-270 corridor provides a key transportation link carrying more than 100,000 vehicles each day. It is a critical freight corridor for the region, with freight trucks making up nearly 10 percent of its daily traffic. Constructed between 1965 and 1970, I-270 no longer meets local and regional transportation demands. The interstate carries far more traffic than it was designed for, and travel delays are persistent. The pavement and bridges are stressed by the traffic loads, and emergency repairs are regularly needed. Frequent crashes, emergency repairs, and planned maintenance require frequent closures of the highway, leading to unreliable as well as slow travel times.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|