I-10 Mobile River Bridge & Bayway Widening
PROJECT WEBSITE: http://www.mobileriverbridge.com
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
08/15/2019
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
Department of Transportation, Federal Highway Administration
Description:
The I-10 Mobile River Bridge and Bayway Widening project is a proposal to increase the capacity of I-10 in Mobile and Baldwin Counties. The project would construct a new six-lane bridge with 215 feet of Air Draft Clearance across the Mobile River and widen the existing I-10 bridges across Mobile Bay from four to eight lanes. The proposed project would provide for a LOS of D in 2030, provide a direct interstate route for hazardous materials transport and would minimize adverse impacts to the maritime industry.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|