USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Portions of this site may be affected due to a lapse in appropriations and associated shutdown/furloughs. Please monitor this page for updates on site availability and operating status.

Heroes Tunnel Improvements

PROJECT WEBSITE: Heroes Tunnel Improvement

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Cancelled

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
CANCELLED

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
N/A

0 out of 0

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Description:

The Heroes Tunnel is located along the Wilbur Cross Parkway (Route 15) in the Town of Woodbridge and the City of New Haven, near the Town of Hamden border.  The Heroes Tunnel is a 1,200-foot long tunnel, which passes through West Rock Ridge in New Haven and Woodbridge.  The existing tunnel was constructed between spring 1948 and fall 1949 and consists of two 28-foot wide by 19-foot high barrels with horseshoe cross-sections.  The northbound and southbound barrels of the tunnel consist of two 11-foot wide travel lanes with 6-inch shoulders and a 26-inch wide raised maintenance walk on each side. The centerlines of the barrels are approximatly 63 feet apart. It is the only tunnel to pass beneath a natural land feature in the State of Connecticut and is eligible for listing on both the National and State Registers of Historic Places. The Heroes Tunnel Project limits encompass the 1,200-foot tunnel and extend approximately 2,000 feet from the tunnel portals, in both the northbound and southbound directions. The proposed project would address structural deficiencies, operational obsolescence, and capacity demand at Heroes Tunnel.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete