FM 565 from SH 99 to SH 146
PROJECT WEBSITE: FM 565 - Chambers County
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
12/11/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
The FM 565 project would extend 2.91 miles from SH 99 to SH 146. The project would reconstruct and widen the exsting FM 565 from SH 99 to just west of the UPRR crossing. Connections would be provided between the FM 565 frontage road and newly widened FM 565 at two separate locations between Ameriport Parkway and the UPRR. A new grade separation would be constructed at the UPRR, with FM 565 traveling over the railroad. Immediately west of this intersection, FM 565 would join the existing alignment of FM 1405, which would be re-designated as FM 565 from this point to SH 146. The existing alignment of FM 565 west of the UPRR intersection to SH 146 would not undergo modifications as part of the proposed project. Access to the industrial complex immediately east of the UPRR would be maintained using the existing FM 565 pavement. A new intersection of the re-designated FM 565 with FM 1405 would be constructed approximately 0.5 miles east of SH 146. From here, an approximately 0.5-mile-long extension of FM 1405 would travel along new location to join the existing FM 1405 to travel south. The proposed project would require the acquisition of approximately 15.5 acres of new ROW
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|