FM 2100 (SH 99 to Huffman Cleveland Rd) North
PROJECT WEBSITE: https://www.txdot.gov/projects/hearings-meetings/houston/2023/fm2100-huffman-cl…
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
09/13/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Texas
Description:
The proposed improvements include widening the two-lane facility to four lanes by adding one 12-foot-wide travel lane in each direction, a 30-foot-wide raised median, a 5-foot-wide sidewalk on the east side of FM 2100, a 10-foot-wide side path on the west side of FM 2100, and open drainage ditches.
The proposed ROW varies approximately 150 feet in width. Two new open drainage channels are also proposed. Proposed drainage channel 1 is approximately 31.5 acres and is located on the east side of FM 2100 and south of Meyer Road. Proposed drainage channel 2 is approximately 6.9 acres and is located on the east side of FM 2100 and south of proposed drainage channel 1.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|