Falcon Field Airport Mesa Hangars/Davcon Development, Environmental Assessment
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/01/2020
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Aviation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Aviation Administration
Description:
The proposed project is the development of a 23-acre area (Parcels 53 and 54 located in the northwest quadrant of the airport), known as the Mesa Hangars/Davcon Development project. The development will include the construction of aircraft hangars that may include office and aircraft manufacturing space. Specifically, the project will include up to 400,000 square feet of aircraft hangar space, as well as approximately 48,000 sq. ft. of office/administration space for the aviation businesses which rent the hangars, approximately 383,000 sq. ft. of aircraft staging ramp, and approximately 235,500 sq. ft. of vehicle parking area. Initial design concepts show hangars to accommodate corporate jets, fixed-wing aircraft, and helicopter uses. These hangars may include office space to support tenant employees. It is anticipated that the surface vehicle parking areas will accommodate 522 vehicles.
Additionally, the development will include the installation of aviation fuel storage tanks and a fuel distribution system. It is anticipated that the fuel system will include up to three fuel storage tanks for Jet A and 100LL avgas fuel, ranging in size from 10,000-30,000 gallons. Underground and above ground storage are both being considered.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|