Duluth International Airport (DLH) - Airport Traffic Control Tower Replacement Project
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/06/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Aviation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Aviation Administration
Description:
This project includes the construction of a new airport traffic control tower (ATCT) to meet the requirements outlined in the FAA’s Siting Facility Requirements Workbook; the existing ATCT at DLH would be demolished. The project would include the construction of a tower structure at the location identified during the AFTIL study, a base building including offices, training rooms, and other support facilities for the operation of the TRACON and the ATCT and a vehicle parking lot as required by the FAA. The ATCT would also provide space for the FAA Tech Ops team based in DLH.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|