COL-20-Salt Creek Canyon

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

icon_calendar

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
10/19/2026

0 out of 1

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Caltrans

LEAD AGENCY
California, CalTrans

Description:

This project is located in Colusa County along State Route 20 (SR 20) near Clearlake Park. It spans from a point 1.10 miles south of Lynch Canyon Trail to a point 0.50 miles north of East Marguerite Street. SR 20 is a two-lane, two-way rural highway. The primary enhancements for this project will be concentrated between Post Mile (PM) 10.3 and 11.8, approximately 2 miles to the west of Walnut Drive. A Road Safety Assessment report was conducted in November 2021 with the following partners: Caltrans; FHWA; City of Williams; Williams Police; Williams Fire; CHP; and Cal Fire. A joint workshop and an in-field review of the corridor was conducted on the segment of SR 20 and several short, mid-term, and long-term solutions were proposed, a number of which are included with this project. The primary objective of this project is to enhance safety at various locations along SR 20. To achieve this, the project seeks a programming amendment in the 2024 State Highway Operation and Protection Program (SHOPP) under the program code 20.XX.201.010, which falls under the Safety Improvement (SI) Program. See the signed scope agreement for full project description.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete