Cleveland Street Phase IV

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
06/02/2026

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
Project Category DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Other Agencies with Actions or Authorizations:

No icon

Virginia

Description:

The City of Virginia Beach is planning improvements along the Cleveland Street corridor from Witchduck Road to Independence Boulevard in Virginia Beach, Virginia. The project will include the construction of a three-lane undivided roadway within a variable width of 70’ to 80-foot right-of-way between Witchduck Road and Independence Boulevard for a distance of approximately 1.2 miles. The intersection of Cleveland Street, Dorset Avenue, and Euclid Road will be realigned and reconfigured to a single-lane roundabout aligning Dorset Avenue to Southern Boulevard. The proposed improvements will provide 4’ to 5’ on-road bicycle lanes and 6’ to 8’ sidewalks on both sides of Cleveland Street west of the roundabout and 8’ to 12’ wide shared-use paths along both sides of Cleveland Street east of the roundabout, as well as aesthetic improvements including a landscaped verge area to enhance the roadway corridor. The existing aerial utilities will be relocated to a new overhead location and LED streetlights will be provided throughout the corridor. The proposed improvements will also include replacement of the traffic signal at Kellam Road and the emergency traffic signal at Virginia Beach Fire Station #7, as well as traffic signal modifications at Witchduck Road and Independence Boulevard.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete