Blackiston Mill Road Bridge Replacement
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE
COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
03/26/2024
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
Department of Transportation, Federal Highway Administration
Other Agencies with Actions or Authorizations:
Department of the Interior, Fish and Wildlife Service
Department of the Army, US Army Corps of Engineers - Regulatory
Description:
The Blackiston Mill bridge and roadway project, (Structure No. 22-00051, National Bridge Inventory (NBI) No. 2200050), crosses Silver Creek, approximately 0.20 mile east of Charleston Rd. The existing structure will be replaced. The preferred alternative will realign Blackiston Mill Rd., beginning just east of Blackiston Boulevard near Silverwood Court, by shifting the roadway to the north and curving to the southeast as it approaches a new bridge over Silver Creek. The proposed structure will be a three-span bridge. A 6-ft.-wide sidewalk with 10 inch wide Bridge Railing will be provided on both sides of the bridge. Southeast of the new bridge, Blackiston Mill Rd. will continue to curve to the southeast until Walnut Grove Drive at which point Blackiston Mill Rd. will return to its existing alignment.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|