Big Sycamore Creek Bridge Replacement
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/01/2028
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The California Department of Transportation (Caltrans) proposes to replace Big Sycamore Creek Bridge (Br. No. 52-11) including its seawall and Rock Slope Protection (RSP).The proposed project would replace the Big Sycamore Creek Bridge that was built in 1938, reconstruct and restore the damaged seawalls and rock slope protection that contribute to the protection of the bridge and roadway, construct an approximate 250-foot long secant wall next to the southbound lane, install rock slope drapery on the cliff immediately adjacent to the northbound side of the highway, reconstruct and reprofile sections of the roadway before and after the bridge, upgrade and reconstruct all existing safety and pavement elements, and install three stormwater treatment devices.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete |
|---|