1122000239 - 11-43165x - SD-163 CULVERTS REPAIR AT VARIOUS LOCATIONS
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects
LEAD AGENCY
California, CalTrans
Description:
The project proposes to repair drainage infrastructure within the City of San Diego, County of San Diego on SR-163 from Ash Street to 0.8 mile north of SR-163 and SR-15 interchange. Complete Streets’ elements on SR-15 at PM 1. 85 along Market Street would install bicycle lanes. Work details include the following: Culvert Restoration: Invert paving at 5 locations: PM 0.58R, 0.59R, 1.31, 1.35, 1.4 Cured-in-place-pipe at 3 locations: PM 0.60R, 0.95, 10.37 Replacements at 2 locations: PM 9.1, 9.05 Cementitious pipe liner in 1 location: PM 10.37 Complete Streets: Striping updates to shoulders and lanes for bike paths at PM 1.8 Market Street. Class IV on westbound and Class II on eastbound.
As of 4/29/25 Caltrans has not started the environmental phase. The project environmental document level has not been determined and scope of work continues to change. Project is targeted for 2027