10-38220_
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
04/26/2027
ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED
SECTOR
Surface Transportation
CATEGORY
Project Category
DOT Projects

LEAD AGENCY
California, CalTrans
Description:
The project proposes to rehabilitate the existing pavement within the project limits. The project also proposes to improve traffic operations at serval intersections in order to accommodate Surface Transportation Assistance Act (STAA) truck turns and provide right and left tum lanes at two other intersections. The shoulder is proposed to be widened to five feet. Additionally, three bridges within the project limits will be widened to a 40-foot clear width and one bridge will be replaced. The roadway profile will be raised as it approach the California Aqueduct Bridge in the southbound direction to improve stopping sight distance over the Crest Vertical Curve. Approximately 60 new parcels are required for this project and relocation of 51 utility poles.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
Milestone | Original Target Date | Current Target Date | Milestone Complete |
---|