0719000373 - LA-110 BRIDGE RAIL UPGRADE
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
							ENVIRONMENTAL REVIEW AND PERMITTING STATUS
							COMPLETE
						
																					COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
																																06/19/2025
																					
							ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
							COMPLETED
						
								SECTOR
								Surface Transportation
							
							CATEGORY
																						
								Project Category
              DOT Projects
																				
								LEAD AGENCY
																	California, CalTrans
															
Description:
The proposed project is located on the northern portion of State Route 110 (SR-110) referred to as the Pasadena Freeway, also known as the Arroyo Seco Parkway. The corridor was designated a National Scenic Byway in 2002 and was listed in the National Register of Historic Places in 2011 as the Arroyo Seco Parkway Historic District (ASPHD). The ASPHD stretches from the Four Level Interchange in Downtown Los Angeles (US-101 and SR-110) northwesterly along a scenic three lane divided parkway through the cities of Los Angeles, South Pasadena, and eventually terminating in Pasadena. The corridor still reflects the original design and character envisioned when the roadway was built in 1939. The project is a Bridge Rail Replacement/Upgrade (SHOPPP 201.112) of the Avenue 43 Ramp Bridge (53-0985S) and the Arroyo Seco Channel Bridge (53- 0276). The proposed project would remove the existing bridge railings on both bridges and replace then with a Concrete Barrier Type 836 with an architectural treatment on the exterior of the new bridge rail.
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
 
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
 - Responsible Agency:
 - Bureau:
 - Action Status:
 - SHPO:
 - Action Identifier:
 - Action Outcome:
 
| Milestone | Original Target Date | Current Target Date | Milestone Complete | 
|---|