Appalachian NGL Hub Rail Transloading Facility Environmental Assessment

PROJECT WEBSITE: Long Ridge Energy Terminal

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

Complete

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
COMPLETE

icon_calendar

COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
08/28/2020

2 out of 2

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation

SECTOR
Surface Transportation

Project Category

CATEGORY
DOT Projects

Department of Transportation

LEAD AGENCY
Department of Transportation, Federal Railroad Administration

Description:

The Federal Railroad Administration (FRA) completed an Environmental Assessment for the construction of the Appalachian Natural Gas Liquids (ANGL) Hub Rail Transloading Facility in Monroe County, OH. The proposed Appalachian NGL Hub Rail Transloading Facility Project (the Project) would be constructed by Ohio River Partners Shareholder LLC (doing business as Long Ridge Energy Terminal [LRET]) to support the continued need for transportation of NGL to end-use markets. The Project consists of two parts: (1) the construction of a new transloading facility (the Transloading Facility) in Hannibal, OH, for which FRA has awarded funds to Monroe County; and (2) the construction of an associated, privately-funded 10-inch diameter pipeline (the NGL Pipeline). The NGL Pipeline would transport NGL from the existing gas processing facility owned by Blue Racer Midstream (Blue Racer) in Natrium, WV, crossing under the Ohio River into Ohio and ultimately terminating approximately 5.9 miles to the southeast at the new Transloading Facility. The Transloading Facility would facilitate loading NGL from the pipeline onto railcars for shipment out of the region to processing facilities and end-use markets.

More information and project documents can be found at: https://railroads.dot.gov/environment/environmental-reviews/appalachian-ngl-hub-rail-transloading-facility

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete