33rd and Cornhusker
PROJECT WEBSITE: https://www.33rdcornhusker.com/
All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.
							ENVIRONMENTAL REVIEW AND PERMITTING STATUS
							IN PROGRESS
						
																																				ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
																																10/15/2027
																					
							ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
							COMPLETED
						
								SECTOR
								Surface Transportation
							
							CATEGORY
																						
								Project Category
              DOT Projects
																				
 
																	
								LEAD AGENCY
																	Department of Transportation, Federal Highway Administration
															
Other Agencies with Actions or Authorizations:
Department of the Interior, Fish and Wildlife Service
Department of the Army, US Army Corps of Engineers - Regulatory
 
																	Nebraska
Department of the Army, US Army Corps of Engineers - Civil Works
Description:
The project will realign 33rd avenue and Adams St in Northern Lincoln, and will also add capacity and reconstruct Highway 6 within the study. The intent of the project is to remove vehicle conflicts with the railroad line running through the study area, including the currently at-grade crossings of the highway at 33rd Ave, Adams Street, and 2 other crossings. There was a PEL study prior, and at one point the project was likely to be an EIS until the project proponent (Railroad Safety District) eliminated their preferred alternative, which was controversial (removed several businesses, 23 low-income housing units, historic properties etc).
To view timetable chart, please turn device sideways (landscape)
Permitting Timetable
The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.
- For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action Information
For additional information, please select an Action from the Permitting Timetable above.
- Action:
- Responsible Agency:
- Bureau:
- Action Status:
- SHPO:
- Action Identifier:
- Action Outcome:
| Milestone | Original Target Date | Current Target Date | Milestone Complete | 
|---|