Section 103 of the Marine Protection, Research, and Sanctuaries Act

Description
Ocean dumping requires a permit issued under Section 103 the MPRSA. In the case of dredged material, the decision to issue a permit is made by the U.S. Army Corps of Engineers, using EPA´s environmental criteria and subject to EPA´s concurrence. EPA is responsible for designating recommended ocean dumping sites (through promulgation in the Code of Federal Regulations).
Statute or Regulations
Title I, Marine Protection Research and Sanctuaries Act (33 USC 1401 et seq. ), Section 103; 33 CFR 325.1 Applications for permits.