USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

Portions of this site may be affected due to a lapse in appropriations and associated shutdown/furloughs. Please monitor this page for updates on site availability and operating status.

Section 1222 Project

Agency / Department
Milestone Group
Responsible Agency
DOE
Sector
Transmission
Activity/Trigger
Application/proposal
Description
The Secretary of Energy, acting through the Southwestern Power Administration (Southwestern) or the Western Area Power Administration (Western), has the authority to design, develop, construct, operate, own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning two types of projects: (1) Electric power transmission facilities and related facilities needed to upgrade existing transmission facilities owned by Southwestern or Western (42 U.S.C 16421(a)), or (2) New electric power transmission facilities and related facilities located within any State in which Southwestern or Western operates (42 U.S.C. 16421(b)).
Statute or Regulations
Section 1222 of the Energy Policy Act of 2005 (42 U.S.C. 16421)
NEPA
0
Permit Inventory Agency
DOE
Editorial Category