Section 1222 Project

Responsible Agency: 
The Secretary of Energy, acting through the Southwestern Power Administration (Southwestern) or the Western Area Power Administration (Western), has the authority to design, develop, construct, operate, own, or participate with other entities in designing, developing, constructing, operating, maintaining, or owning two types of projects: (1) Electric power transmission facilities and related facilities needed to upgrade existing transmission facilities owned by Southwestern or Western (42 U.S.C 16421(a)), or (2) New electric power transmission facilities and related facilities located within any State in which Southwestern or Western operates (42 U.S.C. 16421(b)).
Statute or Regulations: 
Section 1222 of the Energy Policy Act of 2005 (42 U.S.C. 16421)