Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Other projects Federal agencies would like to track and would seek to benefit from the various features such as transparency, predictability, accountability, and efficiency
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Status
Aiya Solar Project (Moapa) Department of Interior Bureau of Indian Affairs Renewable Energy Production Solar Paused
Atlantic Coast Pipeline, Atlantic Coast Pipeline Amendment, Supply Header, and ACP-Piedmont Lease Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete
Atlantic Sunrise Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete
Denbury Riley Ridge to Natrona Project CO2 Department of Interior Bureau of Land Management Pipelines Land-based Oil & Gas - Production/Extraction In Progress
Desert Quartzite Solar Department of Interior Bureau of Land Management Renewable Energy Production Solar In Progress
East Side Coastal Resiliency Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress
Energy Gateway South Transmission Project Department of Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete
Fort Mojave Solar Project (Fort Mojave Tribe) Department of Interior Bureau of Indian Affairs Renewable Energy Production Solar Cancelled
Gateway West Segments 8 & 9 Department of Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete
Gordon Butte Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete
Gulf LNG Liquefaction Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress
Hudson River Rebuild by Design Project : Resist, Delay, Store, Discharge Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress
Kake to Petersburg Transmission Project Department of Agriculture US Forest Service Electricity Transmission Electricity Transmission (all) Complete
Mountain Valley and Equitrans Expansion Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete
Nexus Gas Transmission, TEAL, DTE Lease, and Vector Lease Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete
North Anna Power Station, Unit 3 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete
North-South Project Department of Agriculture US Forest Service Pipelines Land-based Oil & Gas - Production/Extraction Cancelled
Liberty Development and Production Plan Department of Interior Bureau of Ocean Energy Management Conventional Energy Production Offshore Oil & Gas In Progress
PennEast Pipeline Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines In Progress
Plains and Eastern Clean Line Department of Energy Office of Electricity Delivery and Energy Reliability Electricity Transmission Electricity Transmission (all) Complete

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agencysort descending Bureau/Mode Sector Project Type Status
Glenwood Springs South Bridge Surface Transportation Bridges In Progress
Lower Hudson Valley Transit Link Surface Transportation Public Transportation In Progress
SR 20 Improvements (1306-EIS) Surface Transportation Highways Cancelled
Federal Way Extension Light Rail Transit Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete
US 85 - From I-94 to Watford City Bypass Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress
US 51- S. of Pana to E. of Irvington- 70 miles Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress
Second Avenue Subway: Phase 2 Department of Transportation Federal Transit Administration Surface Transportation Public Transportation In Progress
Pellissippi Parkway Extension- From SR-33 to SR-73 (US-321) Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress
University Park Airport Replacement of Aircraft Rescue and Firefighting and Snow Removal Equipment Facilities, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress
US 113 North/South Study - Millsboro South Area Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress
San Francisco Downtown Ferry Terminal Expansion Project Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete
Kennedy Ave Improvements, US 30 to Main Street (1306-EA) Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress
Carolina Crossroads Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress
Morrisville-Stowe Airport Taxiway Extension and Tree Removal, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress
Roanoke Regional Airport Runway 6/24 Safety Improvements (EMAS), Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress
Shiloh Launch Complex Proposed Launch Site, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Commercial Space Launch Site Operator License Cancelled
Tier 1 EIS I-90-94 Study Portage to Wisconsin Dells (Juneau- Sauk- and Columbia Counties) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled
SR 20 IMPROVEMENTS (1306-EIS) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled
I-81 Viaduct Department of Transportation Federal Highway Administration Surface Transportation Bridges In Progress
Beckley Z-Way Projects, Beaver to South Eisenhower Drive Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress

Pages

The infrastructure projects below are other projects being tracked on the Permitting Dashboard.
No projects to show
Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Coordinating Agency Sector Project Status Target Completion Date
Red Rock Hydroelectric Project USACE Water Resource Complete 3/30/2014
ADS-B East Coast Offshore Routes DOT Aviation Complete 3/03/2014
ADS-B In Trail Procedures DOT Aviation Complete 9/29/2015
BakkenLink Crude Oil Pipeline DOI Pipelines Complete 9/27/2012
Bayonne Bridge Raising DHS Ports and Waterways Complete 11/01/2015
Central Everglades Planning Project USACE Water Resource In Progress 8/30/2015
Charleston Harbor Post-45 Study USACE Ports and Waterways In Progress 8/31/2015
Desert Harvest Solar Energy DOI Renewable Energy Complete 2/21/2013
Devil's Lake Rail Improvements DOT Surface Transportation Complete 12/30/2012
Enterprise Mid-American Pipeline (Western Expansion Project II) DOI Pipelines Complete 8/30/2012