USA logoAn Official Website of the United States Government

You are here

Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Titlesort ascending Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
Nexus Gas Transmission, TEAL, DTE Lease, and Vector Lease Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete No
Mountain Valley and Equitrans Expansion Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Complete No
Mid-Breton Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Planned No
Mid-Barataria Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
Liberty Development and Production Plan Department of the Interior Bureau of Ocean Energy Management Conventional Energy Production Offshore Oil & Gas In Progress No
Levy Nuclear Plant Units 1 and 2 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Kake to Petersburg Transmission Project Department of Agriculture US Forest Service Electricity Transmission Electricity Transmission (all) Complete No
Jordan Cove LNG Terminal and Pacific Connector Gas Pipeline Federal Energy Regulatory Commission Office of Energy Projects Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress Yes
Hudson River Rebuild by Design Project : Resist, Delay, Store, Discharge Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Complete No
Gulf LNG Liquefaction Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines Complete No
Gordon Butte Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
Gemini Solar Project Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress Yes
Gateway West Segments 8 & 9 Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
Fort Mojave Solar Project (Fort Mojave Tribe) Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar Cancelled No
Energy Gateway South Transmission Project Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
East Side Coastal Resiliency Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
Desert Quartzite Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress No
Denbury Riley Ridge to Natrona Project CO2 Department of the Interior Bureau of Land Management Pipelines Land-based Oil & Gas - Production/Extraction Complete No
Chokecherry/Sierra Madre Wind, Phase II Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress No
Chokecherry-Sierra Madre Wind Energy (Phase 1) Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore Complete No

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Titlesort ascending Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Project
Venetian Causeway Bridges States Florida Surface Transportation Highways In Progress No
Valley Metro Northwest Phase II Light Rail Extension Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No
US-89; 10600 S to 11400 S States Utah Surface Transportation Highways Complete No
US-27/I-75 Connector Project (1306-EA) Department of Transportation Federal Highway Administration Surface Transportation Highways Paused No
US 90 States Texas Surface Transportation Highways In Progress No
US 85 - From I-94 to Watford City Bypass Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
US 79 States Texas Surface Transportation Highways In Progress No
US 70 Havelock Bypass Department of Transportation Federal Highway Administration Surface Transportation Highways Complete No
US 641 Caldwell/Lyon Counties Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
US 59 Corrigan Relief Route States Texas Surface Transportation Highways Planned No
US 51- US 12/18 (Beltline) Department of Transportation Federal Highway Administration Surface Transportation Highways Paused No
US 51- S. of Pana to E. of Irvington- 70 miles Department of Transportation Federal Highway Administration Surface Transportation Highways Paused No
US 51 I-39/90 - US 12/18 (Beltline); Stoughton - McFarland Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
US 50 Corridor East Tier 1 EIS Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
US 380 States Texas Surface Transportation Highways Complete No
US 36 Added Travel Lanes Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
US 340 - Charles Town Bypass to Virginia Line Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
US 30- IL136 near Fulton to IL 40 in Rock Falls- Whiteside County Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
US 290 and SH 71 (Oakhill Parkway) States Texas Surface Transportation Highways Complete No
US 281/IH 69 States Texas Surface Transportation Highways In Progress No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Titlesort ascending Lead Agency Bureau/Mode Sector Project Type Status Project Category
Lake Pontchartrain and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
LaGuardia Airport Access Improvement Project, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress DOT Projects
Jordan Cove LNG Terminal and Pacific Connector Gas Pipeline Federal Energy Regulatory Commission Office of Energy Projects Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress FAST-41 Covered Projects
I-526 Lowcountry Corridor West Improvements Department of Transportation Department of Transportation Surface Transportation Highways In Progress DOT Projects
I-495/I-270 Managed Lanes Study Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
I-285 Top End Express Lanes Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
Gemini Solar Project Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress FAST-41 Covered Projects
Florida Keys Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Eagle Shadow Mountain Solar Project Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar In Progress MIP Only
Crow Creek Pipeline Project Department of Agriculture US Forest Service Pipelines Interstate Natural Gas Pipelines In Progress MIP Only
Crimson Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress MIP Only
Coos Bay, Oregon Section 408/204(f) Channel Modification Department of the Army US Army Corps of Engineers - Civil Works Ports and Waterways Port expansion or improvement undertakings or projects In Progress MIP Only
Commonwealth LNG Project Federal Energy Regulatory Commission Office of Energy Projects Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress MIP Only
Collier County Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Campo Wind Project with Boulder Brush Facilities Department of the Interior Bureau of Indian Affairs Renewable Energy Production Wind: Other than Federal Offshore In Progress MIP Only
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress FAST-41 Covered Projects
Boise River Basin Feasibility Study Department of the Interior Bureau of Reclamation Water Resources Irrigation and related water supply projects In Progress MIP Only
Bay State Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Planned FAST-41 Covered Projects
Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Allston I-90 Multimodal Project Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Titlesort ascending Agency/Department Sector Project Status Estimated Completion
Pensacola Bay Bridge DOT Surface Transportation Complete 12/27/2018
NiSource - Columbia Gas Transmission, LLC Modernization Project DOT Pipelines Complete 3/28/2013
NextGen Infrastructure Initiative - Houston Metroplex (OAPM) DOT Aviation Complete 1/29/2015
New York and New Jersey Harbor USACE Ports and Waterways In Progress 8/30/2016
NEC FUTURE – A Rail Investment Plan for the Northeast Corridor DOT Surface Transportation Complete 7/12/2017
Navajo Gallup Water Supply Project DOI Water Resource In Progress 3/30/2017
Mohave Wind Energy (BP Wind) DOI Renewable Energy Complete 6/17/2013
Miami Harbor USACE Ports and Waterways Complete 8/14/2012
McCoy Solar Energy (NextEra) DOI Renewable Energy Complete 3/12/2013
Kennebec Bridge Replacement DOT Surface Transportation Complete 1/31/2013

Pages