Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Typesort descending Status Major Infrastructure Project
Jordan Cove LNG Terminal and Pacific Connector Gas Pipeline Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress Yes
Swan Lake North Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) In Progress No
Gordon Butte Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
R.C. Byrd Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) In Progress No
Red River L&D No. 4 Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
North Anna Power Station, Unit 3 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Turkey Point, Units 6 and 7 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license In Progress No
William States Lee III Nuclear Station, Units 1 and 2 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Levy Nuclear Plant Units 1 and 2 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license Complete No
Liberty Development and Production Plan Department of the Interior Bureau of Ocean Energy Management Conventional Energy Production Offshore Oil & Gas In Progress No
Mid-Barataria Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
Mid-Breton Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Planned No
Hudson River Rebuild by Design Project : Resist, Delay, Store, Discharge Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Complete No
East Side Coastal Resiliency Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
Port of Corpus Christi Authority Channel Deepening Project Department of the Army US Army Corps of Engineers - Regulatory Ports and Waterways Port expansion or improvement undertakings or projects In Progress Yes
Cardinal-Hickory Creek 345 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress No
Fort Mojave Solar Project (Fort Mojave Tribe) Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar Cancelled No
Gemini Solar Project Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress Yes
Aiya Solar Project (Moapa) Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar Paused No
Desert Quartzite Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress No

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Typesort descending Status Major Infrastructure Project
Aurora State Airport Obstruction Removal Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
Everglades Airpark - Seaplane landing Area Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
George Bush Intercontinental Airport United Airlines Tech Ops Center Maintenance Facility Expansion, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Morrisville-Stowe Airport Taxiway Extension and Tree Removal, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Bowers Field Airfield Improvements, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
Ken Jernstedt Airfield North Landside Development, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Steven A. Bean Municipal Airport Runway Extension and Other Airport Development, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Greater Rochester International Airport Service Road Relocation, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Crystal Muncipial Airport Airfields and Associated Airport Improvements, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
Paine Field/Snohomish County Airport - Introduction of New Commercial Service, Supplemental EA Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
Trenton-Mercer Airport Relocation of Taxiway D & Rehabilitation of Taxiway G, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Toksook Bay Airport and Access Road Rehabilitation, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
McGrath Airport, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
Hagerstown Regional Airport SNC & PIA Hangars & Dedication of Land as Airport Property, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Morristown Municipal Airport Runway 13-31 Off-Airport Obstruction Removal Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
Wayne Municipal Airport Parallel Taxiway and Miscellaneous Improvements in the Hangar Area, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
St. Cloud Regional Airport Hangar Area Development, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Southwest Oregon Regional Airport Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No
Gnoss Field Runway Extension, Environmental Impact Statement Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Paused No
Dallas Fort Worth Runway 18R/36L Rehabilitation Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) In Progress No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Title Lead Agency Bureau/Mode Sector Project Typesort descending Status Project Category
Port of Corpus Christi Authority Channel Deepening Project Department of the Army US Army Corps of Engineers - Regulatory Ports and Waterways Port expansion or improvement undertakings or projects In Progress FAST-41 Covered Projects
Coos Bay, Oregon Section 408/204(f) Channel Modification Department of the Army US Army Corps of Engineers - Civil Works Ports and Waterways Port expansion or improvement undertakings or projects In Progress MIP Only
Eagle Shadow Mountain Solar Project Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar In Progress MIP Only
Gemini Solar Project Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress FAST-41 Covered Projects
Vineyard Wind Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore In Progress MIP Only
Bay State Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore In Progress FAST-41 Covered Projects
South Fork Wind Farm and South Fork Export Cable Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Paused FAST-41 Covered Projects
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore Planned FAST-41 Covered Projects

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Agency/Department Sector Project Status Estimated Completion
Enterprise WEP III - Mid America Pipeline (MAPL) DOI Pipelines Complete 7/31/2013
Heterogeneous Feed Biorefinery DOE Cancelled 9/29/2015
Jacksonville Harbor (Channel Deepening Study) USACE Ports and Waterways Complete 4/29/2014
Kennebec Bridge Replacement DOT Surface Transportation Complete 1/31/2013
University Circle - Little Italy Rapid Station DOT Surface Transportation Complete 4/29/2013
McCoy Solar Energy (NextEra) DOI Renewable Energy Complete 3/12/2013
East St. Louis Illinois, Metro East Levee USACE Ports and Waterways Complete 9/14/2013
Miami Harbor USACE Ports and Waterways Complete 8/14/2012
Mohave Wind Energy (BP Wind) DOI Renewable Energy Complete 6/17/2013
New York and New Jersey Harbor USACE Ports and Waterways In Progress 8/30/2016