Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Major infrastructure projects as defined in Section 3(e) of Executive Order 13807
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is now available in the new Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Projectsort descending
R.C. Byrd Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Cancelled No
Alaska LNG Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress No
Ocean Wind Project Department of the Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Planned No
Ten West Link Department of the Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) Complete No
Swan Lake North Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) Complete No
Cardinal-Hickory Creek 345 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress No
Denbury Riley Ridge to Natrona Project CO2 Department of the Interior Bureau of Land Management Pipelines Land-based Oil & Gas - Production/Extraction Complete No
Gulf LNG Liquefaction Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines Complete No
Mid-Breton Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Planned No
Tennessee Gas Abandonment and Capacity Restoration Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines Cancelled No
Desert Quartzite Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress No
Liberty Development and Production Plan Department of the Interior Bureau of Ocean Energy Management Conventional Energy Production Offshore Oil & Gas In Progress No
Mid-Barataria Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
Palen Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar Complete No
Hudson River Rebuild by Design Project : Resist, Delay, Store, Discharge Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Complete No
Turkey Point, Units 6 and 7 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license In Progress No
East Side Coastal Resiliency Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress No
PennEast Pipeline Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines In Progress No
Venture Global Calcasieu Pass Terminal and TransCameron Pipeline Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines Complete No
Chokecherry/Sierra Madre Wind, Phase II Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress No

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Status Major Infrastructure Projectsort descending
San Francisco Downtown Ferry Terminal Expansion Project Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No
METRO Blue Line Extension (Bottineau Light Rail Transit) Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No
JFK International Reconfiguration of Taxiways F and H, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
George Bush Intercontinental Airport United Airlines Tech Ops Center Maintenance Facility Expansion, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Kake Access - (1306-EIS) Department of Transportation Federal Highway Administration Surface Transportation Highways Cancelled No
Tier One Baton Rouge Loop Toll Facility Department of Transportation Federal Highway Administration Surface Transportation Roads In Progress No
JFK Airport Bulk Fuel Farm Modification, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
WIS 20 - IH 94 to Oakes Rd - xx (1306-EA) Department of Transportation Federal Highway Administration Surface Transportation Highways Paused No
Northeast Philadelphia Airport Corporate Hangar and Ancillary Projects, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
US 30- IL136 near Fulton to IL 40 in Rock Falls- Whiteside County Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress No
Plymouth Municipal Airport Taxiway Extension, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Potomac Yard Metrorail Project Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No
Oklahoma City-South Texas Corridor Investment Plan Department of Transportation Federal Railroad Administration Surface Transportation Railroads Complete No
Denver International Airport Community Solar Garden Project, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
St. Cloud Regional Airport Hangar Area Development, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Dulles Air Cargo, Passenger and Metro Access Highway (1306-EA) Department of Transportation Federal Highway Administration Surface Transportation Highways Paused No
West Lake Corridor Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No
Atlantic City International Airport Obstruction Removal for Runways 13-31 and 4-22, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Cancelled No
Iowa City Municipal Airport Obstruction Removal and Runway Relocation Thresholds, Environmental Assessment Department of Transportation Federal Aviation Administration Aviation Airport Development Projects (Aviation programs, commerce and safety, airport development and noise, financing, public airports) Complete No
Federal Way Extension Light Rail Transit Department of Transportation Federal Transit Administration Surface Transportation Public Transportation Complete No

Pages

The infrastructure projects below are major infrastructure projects as defined in Section 3(e) of Executive Order 13807.
Title Lead Agency Bureau/Mode Sector Project Type Status Project Category
Borderlands Wind Project Department of the Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress FAST-41 Covered Projects
Lake Pontchartrain and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
South Central Coast Louisiana Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
West Bank and Vicinity, Louisiana General Re-evaluation Report Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Surry-Skiffes Creek-Whealton Aerial Transmission Line Department of the Army US Army Corps of Engineers - Regulatory Electricity Transmission Electricity Transmission (all) In Progress MIP Only
Pier B On-Dock Rail Support Facility Department of Transportation Maritime Administration Ports and Waterways Port expansion or improvement undertakings or projects In Progress DOT Projects
Amite River and Tributaries-East of the Mississippi River, Louisiana, Flood Risk Management Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Upper Barataria Basin Feasibility Study Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Crimson Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress MIP Only
Eagle Shadow Mountain Solar Project Department of the Interior Bureau of Indian Affairs Renewable Energy Production Solar In Progress MIP Only
Yellow Pine Solar Department of the Interior Bureau of Land Management Renewable Energy Production Solar In Progress FAST-41 Covered Projects
Boise River Basin Feasibility Study Department of the Interior Bureau of Reclamation Water Resources Irrigation and related water supply projects In Progress MIP Only
McClellanville 115 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress MIP Only
Commonwealth LNG Project Federal Energy Regulatory Commission Office of Energy Projects Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress MIP Only
Allston I-90 Multimodal Project Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
I-526 Lowcountry Corridor West Improvements Department of Transportation Department of Transportation Surface Transportation Highways In Progress DOT Projects
I-285 Top End Express Lanes Department of Transportation Federal Highway Administration Surface Transportation Highways In Progress DOT Projects
Collier County Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Miami-Dade County Back-Bay Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only
Florida Keys Coastal Storm Risk Management Project Department of the Army US Army Corps of Engineers - Civil Works Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress MIP Only

Pages

Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Agency/Department Sector Project Status Estimated Completion
Enterprise WEP III - Mid America Pipeline (MAPL) DOI Pipelines Complete 7/31/2013
Heterogeneous Feed Biorefinery DOE Cancelled 9/29/2015
Jacksonville Harbor (Channel Deepening Study) USACE Ports and Waterways Complete 4/29/2014
Kennebec Bridge Replacement DOT Surface Transportation Complete 1/31/2013
University Circle - Little Italy Rapid Station DOT Surface Transportation Complete 4/29/2013
McCoy Solar Energy (NextEra) DOI Renewable Energy Complete 3/12/2013
East St. Louis Illinois, Metro East Levee USACE Ports and Waterways Complete 9/14/2013
Miami Harbor USACE Ports and Waterways Complete 8/14/2012
Mohave Wind Energy (BP Wind) DOI Renewable Energy Complete 6/17/2013
New York and New Jersey Harbor USACE Ports and Waterways In Progress 8/30/2016

Pages