USA logoAn Official Website of the United States Government

You are here

Projects

The following classifications of projects are contained within the Federal Infrastructure Permitting Dashboard:

  • Projects Identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act
  • Department of Transportation (DOT) projects subject to Titles I, IX, and XI of the FAST Act
  • Other projects Federal agencies would like to track and would seek to benefit from the various features such as transparency, predictability, accountability, and efficiency
  • Legacy projects, which are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard

It is important to note that a project’s inclusion on the Permitting Dashboard does not imply Federal endorsement of or support for the project or create a presumption that a covered project will be approved, favorably reviewed by any agency, or receive Federal funding. The inclusion of a project on the Permitting Dashboard may be reconsidered based on updated information related to, for example, a change in the scope of the Federal environmental review and authorization processes that apply to the project proposal.

The full project data set is available in the Permitting Dashboard Data Portal to download project and timeline information.

View a pre-filtered report created from the full project data set containing project level information only.

CSV View Permitting Dashboard Public Glossary

The infrastructure projects below are identified as Covered Projects under Title 41 of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Statussort ascending
Plains Pipeline, L.P. Lines 901 and 903 Replacement Project Department of Interior Bureau of Land Management Conventional Energy Production Land-based Oil & Gas - Production/Extraction Planned
Mid-Breton Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Planned
Bay State Wind Project Department of Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore Planned
Aiya Solar Project (Moapa) Department of Interior Bureau of Indian Affairs Renewable Energy Production Solar Paused
Desert Quartzite Solar Department of Interior Bureau of Land Management Renewable Energy Production Solar Paused
East Side Coastal Resiliency Housing and Urban Development Community Planning and Development/Community Development Fund Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) Paused
Swan Lake North Pumped Storage Federal Energy Regulatory Commission Federal Energy Regulatory Commission Renewable Energy Production Non-Federal Hydropower - Licenses (including Non-Federal Marine and Hydrokinetic Projects) In Progress
Chokecherry/Sierra Madre Wind, Phase II Department of Interior Bureau of Land Management Renewable Energy Production Wind: Other than Federal Offshore In Progress
Mid-Barataria Sediment Diversion Department of the Army US Army Corps of Engineers - Regulatory Water Resources Other Water Resource Projects (incl. Waste/Storm-water Infrastructure; Flood Risk Management; Navigation; Restoration activities associated with non-Bureau of Reclamation infrastructure) In Progress
Gemini Solar Project Department of Interior Bureau of Land Management Renewable Energy Production Solar In Progress
Boardman to Hemingway Transmission Line Department of Interior Bureau of Land Management Electricity Transmission Electricity Transmission (all) In Progress
Turkey Point, Units 6 and 7 Nuclear Regulatory Commission Office of New Reactors Conventional Energy Production Nuclear Power Plant - Combined (construction and operating) license In Progress
South Fork Wind Farm and South Fork Export Cable Department of Interior Bureau of Ocean Energy Management Renewable Energy Production Wind: Federal Offshore In Progress
Venture Global Calcasieu Pass Terminal and TransCameron Pipeline Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress
Liberty Development and Production Plan Department of Interior Bureau of Ocean Energy Management Conventional Energy Production Offshore Oil & Gas In Progress
Alaska LNG Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress
PennEast Pipeline Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Interstate Natural Gas Pipelines In Progress
Gulf LNG Liquefaction Project Federal Energy Regulatory Commission Federal Energy Regulatory Commission Pipelines Liquefied Natural Gas Terminal Facilities (Onshore or in State Water), and associated Natural Gas Pipelines In Progress
Denbury Riley Ridge to Natrona Project CO2 Department of Interior Bureau of Land Management Pipelines Land-based Oil & Gas - Production/Extraction In Progress
Cardinal-Hickory Creek 345 kV Transmission Line Project Department of Agriculture Rural Development Electricity Transmission Rural Transmission In Progress

Pages

The infrastructure projects below are DOT projects subject to Titles I, IX, and XI of the Fixing America’s Surface Transportation (FAST) Act.
Title Lead Agency Bureau/Mode Sector Project Type Statussort ascending
LA-110 Dodger Stadium States California Surface Transportation Highways Planned
SR 51 Corridor Improvements J St to Arden Way and Bridge Deck Replacement States California Surface Transportation Highways Planned
South Madera 6-Lane States California Surface Transportation Highways Planned
Rte 74 San Juan Canyon Bridge Improvements States California Surface Transportation Bridges Planned
Refugio Bridge Replacement States California Surface Transportation Highways Planned
Tulare City Widening States California Surface Transportation Highways Planned
SR163 BRIDGE RAIL UPGRADE States California Surface Transportation Bridges Planned
Arroyo De La Laguna: Replace/Rehab Bridge for Scour Mitigation, Bridge Rail Upgrade and Seismic Retrofit States California Surface Transportation Highways Planned
Southbound Eureka Slough Bridge Seismic Retrofit States California Surface Transportation Highways Planned
STOCKTON CHANNEL VIADUCT BRIDGE REHAB States California Surface Transportation Bridges Planned
SBD 40 COLORADO RIVER BR REHAB States California Surface Transportation Bridges Planned
MERCED 99 WIDENING States California Surface Transportation Highways Planned
RIV 215 NEW KELLER RD IC States California Surface Transportation Highways Planned
I-5 Mossdale HOV Widening States California Surface Transportation Highways Planned
South Padre Island 2nd Access States Texas Surface Transportation Highways Planned
SR 605: CONSTRUCT HIGH OCCUPANCY TOLL LANE States California Surface Transportation Highways Planned
SR 140 BRIDGE RAIL UPGRADE States California Surface Transportation Bridges Planned
SR 39 Reopening States California Surface Transportation Highways Planned
CAL 26 SLOPE STABILIZATION States California Surface Transportation Highways Planned
Rio Vista Bridge Operation Overhaul States California Surface Transportation Bridges Planned

Pages

The infrastructure projects below are other projects being tracked on the Permitting Dashboard.
No projects to show
Legacy projects are the infrastructure projects that were part of the original MAX.gov Permitting Dashboard.

CSV Click Here to Download Legacy Project Data

Project Title Agency/Department Sector Project Status Estimated Completion
Red Rock Hydroelectric Project USACE Water Resource Complete 3/30/2014
ADS-B East Coast Offshore Routes DOT Aviation Complete 3/03/2014
ADS-B In Trail Procedures DOT Aviation Complete 9/29/2015
BakkenLink Crude Oil Pipeline DOI Pipelines Complete 9/27/2012
Bayonne Bridge Raising DHS Ports and Waterways Complete 11/01/2015
Central Everglades Planning Project USACE Water Resource In Progress 8/30/2015
Charleston Harbor Post-45 Study USACE Ports and Waterways In Progress 8/31/2015
Desert Harvest Solar Energy DOI Renewable Energy Complete 2/21/2013
Devil's Lake Rail Improvements DOT Surface Transportation Complete 12/30/2012
Enterprise Mid-American Pipeline (Western Expansion Project II) DOI Pipelines Complete 8/30/2012

Pages