Geary Corridor Bus Rapid Transit Project

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.


PROJECT STATUS
COMPLETE
SECTOR
Surface Transportation
CATEGORY
DOT Projects
LEAD AGENCY
Department of Transportation
Description: 

The Geary corridor is among the most heavily-used transit corridors in San Francisco, connecting communities between the Outer Richmond and Downtown, over the entire six-mile length of the Geary Corridor. Over 50,000 daily transit riders rely on Geary bus service. San Francisco County Transportation Authority (SFCTA) and San Francisco Municipal Transportation Agency are proposing enhancements to improve the bus line's travel times,  reliability, and rider comfort.  The proposed Bus Rapid Transit (BRT) project would improve performance by establishing physically separated bus lanes, installing transit-optimized traffic signals, increasing bus frequencies, and building high quality stations.
 

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action
Responsible Agency
Status
Actual Completion Date