Bicentennial Blvd

Project Information
Sector: Surface Transportation
Project Category: 
DOT Projects
Project Status: 
In Progress
Total Estimated Project Cost: 
$29,547,014
Description: 

The proposed project would extend Bicentennial Boulevard from Trenton Road to SH 107 as a new location, four-lane facility. The proposed 2.86-mile roadway extension would consist of a 12-foot wide inside travel lane (one in each direction), a 14-foot wide outside shared use lane for vehicles and bicycles (one in each direction), and five-foot wide sidewalks for pedestrians. Other improvements include 13-foot wide left turn lanes at cross streets, curb and gutter, and drainage improvements. The proposed Bicentennial Boulevard Extension Project would require approximately 1.9 acres of additional ROW, and approximately 0.6 acre of temporary construction easements and 0.2 acre of permanent easements needed for anticipated construction of proposed noise barriers.

The proposed Bicentennial Boulevard improvements include:

  • Constructing a new bridge
  • Constructing new sidewalks

Permitting Timeline

Action Agency Target Completion Status
Environmental Assessment (EA)
Milestones:
Determination to prepare an Environmental Assessment (EA)
Complete 12/20/2016
Target: 12/20/2016
Release for Public Review
Draft EA or other means of coordinating the development of an EA
Complete 02/26/2018
Target: 02/23/2018
Final EA
Target: 12/15/2018
Draft proposed Finding of No Significant Impact (FONSI)
Issuance of Final EA and Finding of No Significant Impact (FONSI)
Decision to prepare an Environmental Impact Statement
Issuance of Supplemental EA
Issuance of Supplemental FONSI
Texas 12/15/2018 In Progress