ANC Runway 15/33 Rehabilitation, Environmental Assessment

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.


PROJECT STATUS
COMPLETE
SECTOR
Aviation
CATEGORY
DOT Projects
LEAD AGENCY
Department of Transportation
Description: 

The proposed work would include the following:

  • Rehabilitate RW 15/33
  • Shift RW 33 displaced threshold north to separate the RW 15/33 RSA from the RW 7L/25R RSA
  • Shift RW 15 threshold north and remove displaced threshold to maintain minimum LDA as a result of the RW 33 threshold change
  • Revise the declared distances for RW 15/33
  • Revise taxiway geometry to accommodate the widened runway
  • Replace runway and taxiway lighting
  • Remove the RW 15 ODALS and replace with a MALSF
  • Reconstruct Taxiway Q to provide access to the relocated RW 15 threshold

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Action
Responsible Agency
Status
Actual Completion Date