Hudson Tunnel Project

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.


PROJECT STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE
Feb 22 2019
0 OUT OF 6
ENVIRONMENTAL REVIEW
AND PERMITTING PROCESSES COMPLETED
SECTOR
Surface Transportation
CATEGORY
DOT Projects
LEAD AGENCY
Department of Transportation
Description: 

The Hudson Tunnel Project includes (1) construction of a new two-track rail tunnel on the Northeast Corridor, connecting New Jersey to Penn Station New York (PSNY) beneath the Hudson River, and including railroad infrastructure in New Jersey and New York connecting the new rail tunnel to the existing NEC, and (2) rehabilitation of the existing two-track NEC tunnel beneath the Hudson River. The new tunnel would be completed prior to rehabilitation work on the existing tunnel, to avoid unacceptable delays to Amtrak and NJ TRANSIT rail service during rehabilitation. 

The purpose of the Proposed Action is to preserve the current functionality of Amtrak’s NEC service and NJ TRANSIT’s commuter rail service between New Jersey and PSNY by repairing the deteriorating North River Tunnel; and to strengthen the NEC’s resiliency to support reliable service by providing redundant capacity under the Hudson River for Amtrak and NJ TRANSIT NEC trains between New Jersey and the existing PSNY. These improvements must be achieved while maintaining uninterrupted commuter and intercity rail service and by optimizing the use of existing infrastructure.

In addition, pertinent information about the project can be found at the project's FRA webpage: https://www.fra.dot.gov/Page/P0937

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.

To view Timetable chart, please turn device sideways (landscape)

Overall Project Timetable
STATUS
Schedule
Extension
Ahead of Schedule
Paused

Action Information

For additional information, please select an Action from the Permitting Timetable above.

Action:
Responsible Agency:
Bureau:
Action Status:
SHPO:
Action Identifier:
Action Outcome:
Milestone
Original Target Date
Current Target Date
Milestone Complete