U.S. Route 58/220 Bypass to North Carolina State Line Limited-Access Study

PROJECT WEBSITE: Martinsville Southern Connector Study

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.

In Progress icon

ENVIRONMENTAL REVIEW AND PERMITTING STATUS
IN PROGRESS

ESTIMATED COMPLETION DATE OF ENVIRONMENTAL REVIEW AND PERMITTING
02/15/2021

1 out of 4

ENVIRONMENTAL REVIEW AND PERMITTING PROCESSES
COMPLETED

Surface Transportation icon

SECTOR
Surface Transportation

CATEGORY
DOT Projects
Major Infrastructure Projects

Department of Transportation icon

LEAD AGENCY
Department of Transportation, Federal Highway Administration

Description:

The Virginia Department of Transportation is evaluating potential transportation improvements along the U.S. Route 220 corridor between the U.S. Route 58/220 Bypass and the North Carolina state line. The Martinsville Connector Study is a first step toward identifying future improvements to the Route 220 corridor within its study limits, and will focus on a potential limited access road on a new location and/or will look at potential new improvements to Route 220.

The area for study generally covers Route 220 between Route 58 and the North Carolina state line. The specific geographic limits will be determined and refined through the course of the study.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.
Loading ...
Overall Project Timetable
 
STATUS
Schedule
Extension or Delay
Ahead of Schedule
Paused
No End Date
Planned

Action Information

For additional information, please select an Action from the Permitting Timetable above.

  • Action:  
  • Responsible Agency:  
  • Bureau:  
  • Action Status:  
  • SHPO:  
  • Action Identifier:  
  • Action Outcome:  
Milestone Original Target Date Current Target Date Milestone Complete