US 50 Corridor East Tier 1 EIS

All dates below are specific to the schedule of the Environmental Review and Permitting processes for this project.


PROJECT STATUS
IN PROGRESS
ESTIMATED COMPLETION DATE
Dec 11 2017
1 OUT OF 1
ENVIRONMENTAL REVIEW
AND PERMITTING PROCESSES COMPLETED
SECTOR
Surface Transportation
CATEGORY
DOT Projects
LEAD AGENCY
Department of Transportation
Description: 

The projects involves transportation improvements on US 50 between Pueblo, and the vicinity of the Kansas State line in Southeastern Colorado.

This environmental study, known as the US 50 Corridor East project, is built on the 2003 CDOT corridor planning study. This planning study culminated in a community-developed vision for the corridor that called for a safer roadway, on or near the existing US 50, that maintains a reasonable traffic flow and speed for the movement of people and goods along and through the Lower Arkansas Valley, while providing flexibility to accommodate future transportation needs.

During the process of developing this US 50 Corridor East Tier 1 Draft EIS, the project team evaluated alternative corridor locations for future improvements versus the No-Action Alternative (i.e., "no changes or improvements to the current highway alignment") based on the project's purpose and need.

Based on the decisions reached during the Tier 1 process, FHWA and CDOT will proceed with Tier 2 studies for specific projects as funding becomes available.

Permitting Timetable

The permitting timetable below displays data as reported by agencies. Dates for Environmental Review and Permitting processes (Actions) that are in 'Paused' or 'Planned' status are subject to change and are not indicative of a project's final schedule.

  • For information about extensions, select an Action from the timetable below and select 'View Action Details' at the bottom of the page.

To view Timetable chart, please turn device sideways (landscape)

Overall Project Timetable
STATUS
Schedule
Extension
Ahead of Schedule
Paused

Action Information

For additional information, please select an Action from the Permitting Timetable above.

Action:
Responsible Agency:
Bureau:
Action Status:
SHPO:
Action Identifier:
Action Outcome:
Milestone
Original Target Date
Current Target Date
Milestone Complete