Silver State Solar South Project (First Solar)

Silver State Solar South Project (First Solar) (Nationally or Regionally Significant Projects)

Coordinating Agency
Department of the Interior
Accountable POC
Greg Helseth
Project Status
Complete
Project Website
Description
The Silver State Solar South project is a solar energy generation facility utilizing photovoltaic technology on 2,427 acres of public land approximately 40 miles south of Las Vegas, in Clark County, Nevada. The project will produce an Read More
Expedited Process

2012 Priority Read More

Reviews, Approvals and Permits

Click on the Description Drop Down Arrow icon to view more information.
Title Responsible Agency Responsible Agency POC Name Target Completion Date Status Description Public Participation Address Public Participation Email Public Participation State Public Participation Website Public Participation Zip
Scoping Department of the Interior Gregory Helseth 10/31/2011 Complete

An early and open process for determining the scope of issues to be addressed and for identifying the significant issues or concerns related to a proposed action and its alternatives

Description Drop Down Arrow
Section 7 Consultation Department of the Interior Gregory Helseth 09/27/2013 Complete

Section 7 of the Endangered Species Act, called "Interagency Cooperation," is the mechanism by which Federal agencies ensure the actions they take, including those they fund or authorize, do not jeopardize the existence of any endangered and threatened species. Under Section 7, BLM must consult with the U.S. Fish and Wildlife Service (Service) about how the proposed solar project and Right of Way Grant application may affect a listed endangered or threatened species. Section 7 Informal Consultation will result in a Biological Assessment to be completed by the BLM and submitted to the Service to start Formal Consultation. Formal Consultation will occur from the Draft Supplemental Environmental Impact Statement (EIS) until the Final Supplemental EIS, resulting in a Biological Opinion written by the Service.

Description Drop Down Arrow
Record of Decision (ROD) Department of the Interior Gregory Helseth 11/22/2013 Complete

Record of Decision on the proposed project.

Description Drop Down Arrow
Public Meeting Department of the Interior Gregory Helseth 08/24/2012 Complete

(Optional)

Description Drop Down Arrow
Draft Supplemental EIS Department of the Interior Gregory Helseth 08/17/2012 Complete

Draft EIS provided to the public for comment.

Description Drop Down Arrow
Notice of Intent Department of the Interior Gregory Helseth 09/01/2011 Complete

Public notice marking the agencies intent to prepare an EIS (Generally incorporates the Notice of Public Scoping, Purpose and Need Statement, and Background Information)

Description Drop Down Arrow
Section 106 Department of the Interior Gregory Helseth 09/13/2013 Complete

Section 106 of the National Historic Preservation Act of 1966 (NHPA) requires Federal agencies to take into account the effects of their undertakings on historic properties, and afford the Advisory Council on Historic Preservation a reasonable opportunity to comment.

Description Drop Down Arrow
Final Supplemental EIS Department of the Interior Gregory Helseth 09/13/2013 Complete

Final EIS that identifies preferred alternative and impacts associated.

Description Drop Down Arrow
Public Comment Department of the Interior Gregory Helseth 11/01/2012 Complete

Opportunity for interested public to review and provide comments on the content of the DEIS

Description Drop Down Arrow