Moapa Solar Energy Center (RES America)

Moapa Solar Energy Center (RES America) (Nationally or Regionally Significant Projects)

Coordinating Agency
Department of the Interior
Accountable POC
Amy Heuslein
Project Status
In Progress
Google Map of Project
Description
This solar project is being developed in cooperation with the Moapa Band of Paiute Indians on a 2,000 acre site on the Moapa River Indian Reservation and on lands administered by the Bureau of Land Management in Clark County, Nevada. If Read More

Reviews, Approvals and Permits

Click on the Description Drop Down Arrow icon to view more information.
Title Responsible Agency Responsible Agency POC Name Target Completion Date Status Description Public Participation Address Public Participation Email Public Participation State Public Participation Website Public Participation Zip
Record of Decision (ROD) Department of the Interior Amy Heuslein 12/31/2013 Planned

Sign the ROD

Description Drop Down Arrow
Public Comment on FEIS Department of the Interior Amy Heuslein 10/30/2013 Planned

Public comment period on the Final Environmental Impact Statement.

Description Drop Down Arrow
Public Comment Period for DEIS Department of the Interior Amy Heuslein 06/03/2013 Planned

Public comment period for Draft Environmental Impact Statement.

Description Drop Down Arrow
2600 North Central Avenue, 12th Floor, Suite 210 amy.heuslein@bia.gov AZ http://www.bia.gov 85004
Public Meetings on DEIS Department of the Interior Amy Heuslein 09/30/2013 Planned

Two public meetings to be held in Nevada on the Moapa Solar Energy Center Draft EIS.

Description Drop Down Arrow
2600 North Central Avenue, 12th Floor, Suite 210 amy.heuslein@bia.gov AZ http://www.bia.gov 85004
Public Scoping Meetings Department of the Interior Amy Heuslein 08/22/2012 Complete

Two public scoping meetings to be held in Nevada for the Moapa Solar Energy Center EIS.

Description Drop Down Arrow
2600 North Central Avenue, 12th Floor, Suite 210 amy.heuslein@bia.gov AZ http://www.bia.gov 85004
Section 106 Compliance Department of the Interior Garry Cantley 07/31/2013 In Progress

Requires federal agencies to take into account the effects of their undertakings on historic properties and afford the ACHP an opportunity to comment. Agencies fulfill this requirement by consulting with the appropriate SHPO/THPO, Indian tribes, local government, others who have a demonstrated interest in the undertaking and the public. Consultation with Federally-recognized Indian Tribes must be on a government-to-government basis and this responsibility must be fulfilled by the federal agency (it cannot be delegated to a project proponent). Through consultation, the agency should identify project alternatives that avoid, minimize or mitigate effects to historic properties.

Description Drop Down Arrow
Section 7 Consultation under the Endangered Species Act (ESA) Department of the Interior USFWS TBD 07/15/2013 Planned

ESA Section 7 consultation required for projects connected to Federal agencies, w/ possible Biological Opinion and possible Incidental Take Statement; may also obtain Incidental Take Permit (Section 10) after submission of a Habitat Conservation Plan (HCP), which triggers an FWS consultation and possible NEPA review. Voluntary consultation reduces Section 9 liability.

Description Drop Down Arrow